Architectural Review
Architectural Review Committee
Sadhana Shenoy - Chair
Melissa Manos - Member / Board Liaison
Elaine Millar - Member
 
Refer to the Architectural Review Section 9.3 of the Bauer Crest Estates CC&Rs
for applicable requirements. The CC&R's are located in the Governance tab on the left.
 
Please send completed forms to arc@bauercrestestates.com for review.
 
 
Roofing Materials
The Roofing Committee developed a recommendation for permissible alternatives to the Cedar Shake initially used. Recommendations were made to the ARC at the February 28, 2011 HOA Board Meeting. There are two documents for your review: a Power Point Presentation describing those recommendations and a Roofing Matrix spreadsheet which summarizes various aspects of the many materials on the market.
As new materials are constantly becoming available, it's important that you request approval from the ARC for any new roofing projects.
 
 
Exterior Home Painting
Homeowners need to submit an Architectural Review Approval form to the ARC committee if they intend to change the exterior colors of their house. Please attach a 6" x 6" sample of your new color choices to the form.  However, before final approval can be determined by the Committee they will need to see the actual paint sample applied to your exterior and let it be dried for at least two days so they can determine the actual finished product. The trim color and door color changes must also be approved in the same manner.
 
 
Tree Removal
Any tree over 5" in diameter and/or over 4'6" in height requires pre-approval to remove, along with clear justification and any plans for re-planting.
Washington County requires a certain number of curbside trees per linear footage along the street, and has specification for acceptable tree types.  You can find the recommended list here